Company

RWTP LLC / PDO 

Location

Rima / Oman

Rima Oil Produced Water Treatment Plant (RWTP)


Design, engineering and start-up of the Rima Wetland (RWTP) which is an OPW treatment plant, with a capacity up to 46,000 m3/d and in operation since 10.07.2022. The plant design considers an extension up to 120,000 m3/d treatment capacity.